Verda James Pedestrian Bridge
This was a City Of Casper project that consisted of replacing many critical
components for the pedestrian bridge. With large equipment for lifting
prefabricated concrete slabs, safety is at the highest concern on projects like
these. Our very qualified team handled the project cleanly and professionally
for the city with many praises from Lower and Co (project engineer) and the
city engineer Andrew Colling.
Status: Complete
Key Elements:
• Keeping the public safe during construction
• Concrete demo
• Repair of supports
• New steel runners
• Concrete sections
• All concrete sealed
• Fencing on ramps
• Repairs to landscape